Preparing for connection |
Prepping trench for compaction |
Pipe end in shoring |
|---|---|---|
Nuclear compaction testing |
Cleaning around valves prior to backfill |
|
Resident's trees to be replanted |
Excavation for concrete chamber |
Custom pipe fittings delivered |
Pipe-fitters seaming pipes |
Giving the encased hydro duct support |
Pumping concrete to construct chamber |
Lowering prefabricated bend into trench |
Hoe-packing lift next to a sand bag wall |
Labourers spreading asphalt |
Mainline bedded at bottom of chamber |
Custom ductwork at base of manhole |
Strapping pipe to be lowered into trench |
Pedre's John Deere 650D |
650D Lowering pipe into trench |
Ductile Iron "Reduced T" |
Sidewalk restoration |
Welding outlet pipe to mainline |
3m Boulder |
Rolling final lift of bedding sand |
Exposed pipe leading to excavation |
Pipe lowered to base of chamber |
Night shift crosses pipeline at Burris St. |
Fresh snow fall at worksite |