26620 56th Avenue
Langley, B.C. V4W 3X5
Phone: 604-881-2411 FAX: 604-881-2412

Project Highlights - Photo Gallery


Preparing for connection

Prepping trench for compaction

Pipe end in shoring
Preparing for connection

Nuclear compaction testing

Cleaning around valves prior to backfill

Resident's trees to be replanted

Excavation for concrete chamber

Custom pipe fittings delivered

Pipe-fitters seaming pipes

Giving the encased hydro duct support

Pumping concrete to construct chamber

Lowering prefabricated bend into trench

Hoe-packing lift next to a sand bag wall

Labourers spreading asphalt

Mainline bedded at bottom of chamber

Custom ductwork at base of manhole

Strapping pipe to be lowered into trench

Pedre's John Deere 650D

650D Lowering pipe into trench

Ductile Iron "Reduced T"

Sidewalk restoration

Welding outlet pipe to mainline

3m Boulder

Rolling final lift of bedding sand

Exposed pipe leading to excavation

Pipe lowered to base of chamber

Night shift crosses pipeline at Burris St.

Fresh snow fall at worksite